+1 (704) 266-3234

Global Data Center Construction Market Size, Status And Forecast 2021-2027

Published on: Nov 2021 | From USD $3500 | Published By: GIR JAPANESE | Number Of Pages: 116

A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Whiting-Turner Contracting, Turner Construction, Holder Construction, DPR Construction, Fortis Construction, HITT Contracting, STO Building Group (formerly Structure Tone), JE Dunn Construction, Hensel Phelps and AECOM are the Top 10 players of the global Data Center Construction market. They took up about 45% of the global market.Asia-Pacific is the largest market with a market share of about 40%, followed by North America with a market share of about 35%.

Market Analysis and Insights: Global Data Center Construction Market
The global Data Center Construction market size is projected to reach US$ 49550 million by 2027, from US$ 24140 million in 2020, at a CAGR of 10.8% during 2021-2027.
With industry-standard accuracy in analysis and high data integrity, the report makes a brilliant attempt to unveil key opportunities available in the global Data Center Construction market to help players in achieving a strong market position. Buyers of the report can access verified and reliable market forecasts, including those for the overall size of the global Data Center Construction market in terms of revenue.
On the whole, the report proves to be an effective tool that players can use to gain a competitive edge over their competitors and ensure lasting success in the global Data Center Construction market. All of the findings, data, and information provided in the report are validated and revalidated with the help of trustworthy sources. The analysts who have authored the report took a unique and industry-best research and analysis approach for an in-depth study of the global Data Center Construction market.

Global Data Center Construction Scope and Market Size
Data Center Construction market is segmented by company, region (country), by Type, and by Application. Players, stakeholders, and other participants in the global Data Center Construction market will be able to gain the upper hand as they use the report as a powerful resource. The segmental analysis focuses on revenue and forecast by Type and by Application in terms of revenue and forecast for the period 2016-2027.

Segment by Type
Electrical Construction
Mechanical Construction
General Construction

Segment by Application
Finance
Internet
Telecommunications
Government
Others

By Region
North America
U.S.
Canada
Europe
Germany
France
U.K.
Italy
Russia
Nordic
Rest of Europe
Asia-Pacific
China
Japan
South Korea
Southeast Asia
India
Australia
Rest of Asia
Latin America
Mexico
Brazil
Rest of Latin America
Middle East & Africa
Turkey
Saudi Arabia
UAE
Rest of MEA

By Company
Whiting-Turner Contracting
Turner Construction
Holder Construction
DPR Construction
Fortis Construction
HITT Contracting
STO Building Group (formerly Structure Tone)
JE Dunn Construction
Hensel Phelps
AECOM
Rogers-O'Brien Construction
Clune Construction
Gilbane
Balfour Beatty US
Mortenson Construction

1 Report Overview
1.1 Study Scope
1.2 Market Analysis by Type
1.2.1 Global Data Center Construction Market Size Growth Rate by Type: 2016 VS 2021 VS 2027
1.2.2 Electrical Construction
1.2.3 Mechanical Construction
1.2.4 General Construction
1.3 Market by Application
1.3.1 Global Data Center Construction Market Share by Application: 2016 VS 2021 VS 2027
1.3.2 Finance
1.3.3 Internet
1.3.4 Telecommunications
1.3.5 Government
1.3.6 Others
1.4 Study Objectives
1.5 Years Considered

2 Global Growth Trends
2.1 Global Data Center Construction Market Perspective (2016-2027)
2.2 Data Center Construction Growth Trends by Regions
2.2.1 Data Center Construction Market Size by Regions: 2016 VS 2021 VS 2027
2.2.2 Data Center Construction Historic Market Share by Regions (2016-2021)
2.2.3 Data Center Construction Forecasted Market Size by Regions (2022-2027)
2.3 Data Center Construction Industry Dynamic
2.3.1 Data Center Construction Market Trends
2.3.2 Data Center Construction Market Drivers
2.3.3 Data Center Construction Market Challenges
2.3.4 Data Center Construction Market Restraints

3 Competition Landscape by Key Players
3.1 Global Top Data Center Construction Players by Revenue
3.1.1 Global Top Data Center Construction Players by Revenue (2016-2021)
3.1.2 Global Data Center Construction Revenue Market Share by Players (2016-2021)
3.2 Global Data Center Construction Market Share by Company Type (Tier 1, Tier 2 and Tier 3)
3.3 Players Covered: Ranking by Data Center Construction Revenue
3.4 Global Data Center Construction Market Concentration Ratio
3.4.1 Global Data Center Construction Market Concentration Ratio (CR5 and HHI)
3.4.2 Global Top 10 and Top 5 Companies by Data Center Construction Revenue in 2020
3.5 Data Center Construction Key Players Head office and Area Served
3.6 Key Players Data Center Construction Product Solution and Service
3.7 Date of Enter into Data Center Construction Market
3.8 Mergers & Acquisitions, Expansion Plans

4 Data Center Construction Breakdown Data by Type
4.1 Global Data Center Construction Historic Market Size by Type (2016-2021)
4.2 Global Data Center Construction Forecasted Market Size by Type (2022-2027)

5 Data Center Construction Breakdown Data by Application
5.1 Global Data Center Construction Historic Market Size by Application (2016-2021)
5.2 Global Data Center Construction Forecasted Market Size by Application (2022-2027)

6 North America
6.1 North America Data Center Construction Market Size (2016-2027)
6.2 North America Data Center Construction Market Size by Type
6.2.1 North America Data Center Construction Market Size by Type (2016-2021)
6.2.2 North America Data Center Construction Market Size by Type (2022-2027)
6.2.3 North America Data Center Construction Market Size by Type (2016-2027)
6.3 North America Data Center Construction Market Size by Application
6.3.1 North America Data Center Construction Market Size by Application (2016-2021)
6.3.2 North America Data Center Construction Market Size by Application (2022-2027)
6.3.3 North America Data Center Construction Market Size by Application (2016-2027)
6.4 North America Data Center Construction Market Size by Country
6.4.1 North America Data Center Construction Market Size by Country (2016-2021)
6.4.2 North America Data Center Construction Market Size by Country (2022-2027)
6.4.3 United States
6.4.4 Canada

7 Europe
7.1 Europe Data Center Construction Market Size (2016-2027)
7.2 Europe Data Center Construction Market Size by Type
7.2.1 Europe Data Center Construction Market Size by Type (2016-2021)
7.2.2 Europe Data Center Construction Market Size by Type (2022-2027)
7.2.3 Europe Data Center Construction Market Size by Type (2016-2027)
7.3 Europe Data Center Construction Market Size by Application
7.3.1 Europe Data Center Construction Market Size by Application (2016-2021)
7.3.2 Europe Data Center Construction Market Size by Application (2022-2027)
7.3.3 Europe Data Center Construction Market Size by Application (2016-2027)
7.4 Europe Data Center Construction Market Size by Country
7.4.1 Europe Data Center Construction Market Size by Country (2016-2021)
7.4.2 Europe Data Center Construction Market Size by Country (2022-2027)
7.4.3 Germany
7.4.4 France
7.4.5 U.K.
7.4.6 Italy
7.4.7 Russia
7.4.8 Nordic

8 Asia-Pacific
8.1 Asia-Pacific Data Center Construction Market Size (2016-2027)
8.2 Asia-Pacific Data Center Construction Market Size by Type
8.2.1 Asia-Pacific Data Center Construction Market Size by Type (2016-2021)
8.2.2 Asia-Pacific Data Center Construction Market Size by Type (2022-2027)
8.2.3 Asia-Pacific Data Center Construction Market Size by Type (2016-2027)
8.3 Asia-Pacific Data Center Construction Market Size by Application
8.3.1 Asia-Pacific Data Center Construction Market Size by Application (2016-2021)
8.3.2 Asia-Pacific Data Center Construction Market Size by Application (2022-2027)
8.3.3 Asia-Pacific Data Center Construction Market Size by Application (2016-2027)
8.4 Asia-Pacific Data Center Construction Market Size by Region
8.4.1 Asia-Pacific Data Center Construction Market Size by Region (2016-2021)
8.4.2 Asia-Pacific Data Center Construction Market Size by Region (2022-2027)
8.4.3 China
8.4.4 Japan
8.4.5 South Korea
8.4.6 Southeast Asia
8.4.7 India
8.4.8 Australia

9 Latin America
9.1 Latin America Data Center Construction Market Size (2016-2027)
9.2 Latin America Data Center Construction Market Size by Type
9.2.1 Latin America Data Center Construction Market Size by Type (2016-2021)
9.2.2 Latin America Data Center Construction Market Size by Type (2022-2027)
9.2.3 Latin America Data Center Construction Market Size by Type (2016-2027)
9.3 Latin America Data Center Construction Market Size by Application
9.3.1 Latin America Data Center Construction Market Size by Application (2016-2021)
9.3.2 Latin America Data Center Construction Market Size by Application (2022-2027)
9.3.3 Latin America Data Center Construction Market Size by Application (2016-2027)
9.4 Latin America Data Center Construction Market Size by Country
9.4.1 Latin America Data Center Construction Market Size by Country (2016-2021)
9.4.2 Latin America Data Center Construction Market Size by Country (2022-2027)
9.4.3 Mexico
9.4.4 Brazil

10 Middle East & Africa
10.1 Middle East & Africa Data Center Construction Market Size (2016-2027)
10.2 Middle East & Africa Data Center Construction Market Size by Type
10.2.1 Middle East & Africa Data Center Construction Market Size by Type (2016-2021)
10.2.2 Middle East & Africa Data Center Construction Market Size by Type (2022-2027)
10.2.3 Middle East & Africa Data Center Construction Market Size by Type (2016-2027)
10.3 Middle East & Africa Data Center Construction Market Size by Application
10.3.1 Middle East & Africa Data Center Construction Market Size by Application (2016-2021)
10.3.2 Middle East & Africa Data Center Construction Market Size by Application (2022-2027)
10.3.3 Middle East & Africa Data Center Construction Market Size by Application (2016-2027)
10.4 Middle East & Africa Data Center Construction Market Size by Country
10.4.1 Middle East & Africa Data Center Construction Market Size by Country (2016-2021)
10.4.2 Middle East & Africa Data Center Construction Market Size by Country (2022-2027)
10.4.3 Turkey
10.4.4 Saudi Arabia
10.4.5 UAE

11 Key Players Profiles
11.1 Whiting-Turner Contracting
11.1.1 Whiting-Turner Contracting Company Details
11.1.2 Whiting-Turner Contracting Business Overview
11.1.3 Whiting-Turner Contracting Data Center Construction Introduction
11.1.4 Whiting-Turner Contracting Revenue in Data Center Construction Business (2016-2021)
11.1.5 Whiting-Turner Contracting Recent Development
11.2 Turner Construction
11.2.1 Turner Construction Company Details
11.2.2 Turner Construction Business Overview
11.2.3 Turner Construction Data Center Construction Introduction
11.2.4 Turner Construction Revenue in Data Center Construction Business (2016-2021)
11.2.5 Turner Construction Recent Development
11.3 Holder Construction
11.3.1 Holder Construction Company Details
11.3.2 Holder Construction Business Overview
11.3.3 Holder Construction Data Center Construction Introduction
11.3.4 Holder Construction Revenue in Data Center Construction Business (2016-2021)
11.3.5 Holder Construction Recent Development
11.4 DPR Construction
11.4.1 DPR Construction Company Details
11.4.2 DPR Construction Business Overview
11.4.3 DPR Construction Data Center Construction Introduction
11.4.4 DPR Construction Revenue in Data Center Construction Business (2016-2021)
11.4.5 DPR Construction Recent Development
11.5 Fortis Construction
11.5.1 Fortis Construction Company Details
11.5.2 Fortis Construction Business Overview
11.5.3 Fortis Construction Data Center Construction Introduction
11.5.4 Fortis Construction Revenue in Data Center Construction Business (2016-2021)
11.5.5 Fortis Construction Recent Development
11.6 HITT Contracting
11.6.1 HITT Contracting Company Details
11.6.2 HITT Contracting Business Overview
11.6.3 HITT Contracting Data Center Construction Introduction
11.6.4 HITT Contracting Revenue in Data Center Construction Business (2016-2021)
11.6.5 HITT Contracting Recent Development
11.7 STO Building Group (formerly Structure Tone)
11.7.1 STO Building Group (formerly Structure Tone) Company Details
11.7.2 STO Building Group (formerly Structure Tone) Business Overview
11.7.3 STO Building Group (formerly Structure Tone) Data Center Construction Introduction
11.7.4 STO Building Group (formerly Structure Tone) Revenue in Data Center Construction Business (2016-2021)
11.7.5 STO Building Group (formerly Structure Tone) Recent Development
11.8 JE Dunn Construction
11.8.1 JE Dunn Construction Company Details
11.8.2 JE Dunn Construction Business Overview
11.8.3 JE Dunn Construction Data Center Construction Introduction
11.8.4 JE Dunn Construction Revenue in Data Center Construction Business (2016-2021)
11.8.5 JE Dunn Construction Recent Development
11.9 Hensel Phelps
11.9.1 Hensel Phelps Company Details
11.9.2 Hensel Phelps Business Overview
11.9.3 Hensel Phelps Data Center Construction Introduction
11.9.4 Hensel Phelps Revenue in Data Center Construction Business (2016-2021)
11.9.5 Hensel Phelps Recent Development
11.10 AECOM
11.10.1 AECOM Company Details
11.10.2 AECOM Business Overview
11.10.3 AECOM Data Center Construction Introduction
11.10.4 AECOM Revenue in Data Center Construction Business (2016-2021)
11.10.5 AECOM Recent Development
11.11 Rogers-O'Brien Construction
11.11.1 Rogers-O'Brien Construction Company Details
11.11.2 Rogers-O'Brien Construction Business Overview
11.11.3 Rogers-O'Brien Construction Data Center Construction Introduction
11.11.4 Rogers-O'Brien Construction Revenue in Data Center Construction Business (2016-2021)
11.11.5 Rogers-O'Brien Construction Recent Development
11.12 Clune Construction
11.12.1 Clune Construction Company Details
11.12.2 Clune Construction Business Overview
11.12.3 Clune Construction Data Center Construction Introduction
11.12.4 Clune Construction Revenue in Data Center Construction Business (2016-2021)
11.12.5 Clune Construction Recent Development
11.13 Gilbane
11.13.1 Gilbane Company Details
11.13.2 Gilbane Business Overview
11.13.3 Gilbane Data Center Construction Introduction
11.13.4 Gilbane Revenue in Data Center Construction Business (2016-2021)
11.13.5 Gilbane Recent Development
11.14 Balfour Beatty US
11.14.1 Balfour Beatty US Company Details
11.14.2 Balfour Beatty US Business Overview
11.14.3 Balfour Beatty US Data Center Construction Introduction
11.14.4 Balfour Beatty US Revenue in Data Center Construction Business (2016-2021)
11.14.5 Balfour Beatty US Recent Development
11.15 Mortenson Construction
11.15.1 Mortenson Construction Company Details
11.15.2 Mortenson Construction Business Overview
11.15.3 Mortenson Construction Data Center Construction Introduction
11.15.4 Mortenson Construction Revenue in Data Center Construction Business (2016-2021)
11.15.5 Mortenson Construction Recent Development

12 Analyst's Viewpoints/Conclusions

13 Appendix
13.1 Research Methodology
13.1.1 Methodology/Research Approach
13.1.2 Data Source
13.2 Disclaimer
13.3 Author Details

List of Tables
Table 1. Global Data Center Construction Market Size Growth Rate by Type (US$ Million):2016 VS 2021 VS 2027
Table 2. Key Players of Electrical Construction
Table 3. Key Players of Mechanical Construction
Table 4. Key Players of General Construction
Table 5. Global Data Center Construction Market Size Growth by Application (US$ Million): 2016 VS 2021 VS 2027
Table 6. Global Data Center Construction Market Size by Regions (US$ Million): 2016 VS 2021 VS 2027
Table 7. Global Data Center Construction Market Size by Regions (2016-2021) & (US$ Million)
Table 8. Global Data Center Construction Market Share by Regions (2016-2021)
Table 9. Global Data Center Construction Forecasted Market Size by Regions (2022-2027) & (US$ Million)
Table 10. Global Data Center Construction Market Share by Regions (2022-2027)
Table 11. Data Center Construction Market Trends
Table 12. Data Center Construction Market Drivers
Table 13. Data Center Construction Market Challenges
Table 14. Data Center Construction Market Restraints
Table 15. Global Data Center Construction Revenue by Players (2016-2021) & (US$ Million)
Table 16. Global Data Center Construction Market Share by Players (2016-2021)
Table 17. Global Top Data Center Construction Players by Company Type (Tier 1, Tier 2 and Tier 3) (based on the Revenue in Data Center Construction as of 2020)
Table 18. Ranking of Global Top Data Center Construction Companies by Revenue (US$ Million) in 2020
Table 19. Global 5 Largest Players Market Share by Data Center Construction Revenue (CR5 and HHI) & (2016-2021)
Table 20. Key Players Headquarters and Area Served
Table 21. Key Players Data Center Construction Product Solution and Service
Table 22. Date of Enter into Data Center Construction Market
Table 23. Mergers & Acquisitions, Expansion Plans
Table 24. Global Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 25. Global Data Center Construction Revenue Market Share by Type (2016-2021)
Table 26. Global Data Center Construction Forecasted Market Size by Type (2022-2027) (US$ Million)
Table 27. Global Data Center Construction Revenue Market Share by Type (2022-2027) & (US$ Million)
Table 28. Global Data Center Construction Market Size Share by Application (2016-2021) & (US$ Million)
Table 29. Global Data Center Construction Revenue Market Share by Application (2016-2021)
Table 30. Global Data Center Construction Forecasted Market Size by Application (2022-2027) (US$ Million)
Table 31. Global Data Center Construction Revenue Market Share by Application (2022-2027) & (US$ Million)
Table 32. North America Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 33. North America Data Center Construction Market Size by Type (2022-2027) & (US$ Million)
Table 34. North America Data Center Construction Market Size by Application (2016-2021) (US$ Million)
Table 35. North America Data Center Construction Market Size by Application (2022-2027) & (US$ Million)
Table 36. North America Data Center Construction Market Size by Country (2016-2021) & (US$ Million)
Table 37. North America Data Center Construction Market Size by Country (2022-2027) & (US$ Million)
Table 38. Europe Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 39. Europe Data Center Construction Market Size by Type (2022-2027) & (US$ Million)
Table 40. Europe Data Center Construction Market Size by Application (2016-2021) (US$ Million)
Table 41. Europe Data Center Construction Market Size by Application (2022-2027) & (US$ Million)
Table 42. Europe Data Center Construction Market Size by Country (2016-2021) & (US$ Million)
Table 43. Europe Data Center Construction Market Size by Country (2022-2027) & (US$ Million)
Table 44. Asia-Pacific Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 45. Asia-Pacific Data Center Construction Market Size by Type (2022-2027) & (US$ Million)
Table 46. Asia-Pacific Data Center Construction Market Size by Application (2016-2021) (US$ Million)
Table 47. Asia-Pacific Data Center Construction Market Size by Application (2022-2027) & (US$ Million)
Table 48. Asia-Pacific Data Center Construction Market Size by Region (2016-2021) & (US$ Million)
Table 49. Asia-Pacific Data Center Construction Market Size by Region (2022-2027) & (US$ Million)
Table 50. Latin America Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 51. Latin America Data Center Construction Market Size by Type (2022-2027) & (US$ Million)
Table 52. Latin America Data Center Construction Market Size by Application (2016-2021) (US$ Million)
Table 53. Latin America Data Center Construction Market Size by Application (2022-2027) & (US$ Million)
Table 54. Latin America Data Center Construction Market Size by Country (2016-2021) & (US$ Million)
Table 55. Latin America Data Center Construction Market Size by Country (2022-2027) & (US$ Million)
Table 56. Middle East & Africa Data Center Construction Market Size by Type (2016-2021) (US$ Million)
Table 57. Middle East & Africa Data Center Construction Market Size by Type (2022-2027) & (US$ Million)
Table 58. Middle East & Africa Data Center Construction Market Size by Application (2016-2021) (US$ Million)
Table 59. Middle East & Africa Data Center Construction Market Size by Application (2022-2027) & (US$ Million)
Table 60. Middle East & Africa Data Center Construction Market Size by Country (2016-2021) & (US$ Million)
Table 61. Middle East & Africa Data Center Construction Market Size by Country (2022-2027) & (US$ Million)
Table 62. Whiting-Turner Contracting Company Details
Table 63. Whiting-Turner Contracting Business Overview
Table 64. Whiting-Turner Contracting Data Center Construction Product
Table 65. Whiting-Turner Contracting Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 66. Whiting-Turner Contracting Recent Development
Table 67. Turner Construction Company Details
Table 68. Turner Construction Business Overview
Table 69. Turner Construction Data Center Construction Product
Table 70. Turner Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 71. Turner Construction Recent Development
Table 72. Holder Construction Company Details
Table 73. Holder Construction Business Overview
Table 74. Holder Construction Data Center Construction Product
Table 75. Holder Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 76. Holder Construction Recent Development
Table 77. DPR Construction Company Details
Table 78. DPR Construction Business Overview
Table 79. DPR Construction Data Center Construction Product
Table 80. DPR Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 81. DPR Construction Recent Development
Table 82. Fortis Construction Company Details
Table 83. Fortis Construction Business Overview
Table 84. Fortis Construction Data Center Construction Product
Table 85. Fortis Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 86. Fortis Construction Recent Development
Table 87. HITT Contracting Company Details
Table 88. HITT Contracting Business Overview
Table 89. HITT Contracting Data Center Construction Product
Table 90. HITT Contracting Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 91. HITT Contracting Recent Development
Table 92. STO Building Group (formerly Structure Tone) Company Details
Table 93. STO Building Group (formerly Structure Tone) Business Overview
Table 94. STO Building Group (formerly Structure Tone) Data Center Construction Product
Table 95. STO Building Group (formerly Structure Tone) Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 96. STO Building Group (formerly Structure Tone) Recent Development
Table 97. JE Dunn Construction Company Details
Table 98. JE Dunn Construction Business Overview
Table 99. JE Dunn Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 100. JE Dunn Construction Recent Development
Table 101. Hensel Phelps Company Details
Table 102. Hensel Phelps Business Overview
Table 103. Hensel Phelps Data Center Construction Product
Table 104. Hensel Phelps Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 105. Hensel Phelps Recent Development
Table 106. AECOM Company Details
Table 107. AECOM Business Overview
Table 108. AECOM Data Center Construction Product
Table 109. AECOM Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 110. AECOM Recent Development
Table 111. Rogers-O'Brien Construction Company Details
Table 112. Rogers-O'Brien Construction Business Overview
Table 113. Rogers-O'Brien Construction Data Center Construction Product
Table 114. Rogers-O'Brien Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 115. Rogers-O'Brien Construction Recent Development
Table 116. Clune Construction Company Details
Table 117. Clune Construction Business Overview
Table 118. Clune Construction Data Center Construction Product
Table 119. Clune Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 120. Clune Construction Recent Development
Table 121. Gilbane Company Details
Table 122. Gilbane Business Overview
Table 123. Gilbane Data Center Construction Product
Table 124. Gilbane Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 125. Gilbane Recent Development
Table 126. Balfour Beatty US Company Details
Table 127. Balfour Beatty US Business Overview
Table 128. Balfour Beatty US Data Center Construction Product
Table 129. Balfour Beatty US Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 130. Balfour Beatty US Recent Development
Table 131. Mortenson Construction Company Details
Table 132. Mortenson Construction Business Overview
Table 133. Mortenson Construction Data Center Construction Product
Table 134. Mortenson Construction Revenue in Data Center Construction Business (2016-2021) & (US$ Million)
Table 135. Mortenson Construction Recent Development
Table 136. Research Programs/Design for This Report
Table 137. Key Data Information from Secondary Sources
Table 138. Key Data Information from Primary Sources
List of Figures
Figure 1. Global Data Center Construction Market Share by Type: 2020 VS 2027
Figure 2. Electrical Construction Features
Figure 3. Mechanical Construction Features
Figure 4. General Construction Features
Figure 5. Global Data Center Construction Market Share by Application: 2020 VS 2027
Figure 6. Finance Case Studies
Figure 7. Internet Case Studies
Figure 8. Telecommunications Case Studies
Figure 9. Government Case Studies
Figure 10. Others Case Studies
Figure 11. Data Center Construction Report Years Considered
Figure 12. Global Data Center Construction Market Size (US$ Million), Year-over-Year: 2016-2027
Figure 13. Global Data Center Construction Market Size (US$ Million), 2016 VS 2021 VS 2027
Figure 14. Global Data Center Construction Market Share by Regions: 2020 VS 2027
Figure 15. Global Data Center Construction Market Share by Regions (2022-2027)
Figure 16. Global Data Center Construction Market Share by Players in 2020
Figure 17. Global Top Data Center Construction Players by Company Type (Tier 1, Tier 2 and Tier 3) (based on the Revenue in Data Center Construction as of 2020
Figure 18. The Top 10 and 5 Players Market Share by Data Center Construction Revenue in 2020
Figure 19. Global Data Center Construction Revenue Market Share by Type (2016-2021)
Figure 20. Global Data Center Construction Revenue Market Share by Type (2022-2027)
Figure 21. North America Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 22. North America Data Center Construction Market Share by Type (2016-2027)
Figure 23. North America Data Center Construction Market Share by Application (2016-2027)
Figure 24. North America Data Center Construction Market Share by Country (2016-2027)
Figure 25. United States Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 26. Canada Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 27. Europe Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 28. Europe Data Center Construction Market Share by Type (2016-2027)
Figure 29. Europe Data Center Construction Market Share by Application (2016-2027)
Figure 30. Europe Data Center Construction Market Share by Country (2016-2027)
Figure 31. Germany Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 32. France Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 33. U.K. Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 34. Italy Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 35. Russia Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 36. Nordic Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 37. Asia-Pacific Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 38. Asia-Pacific Data Center Construction Market Share by Type (2016-2027)
Figure 39. Asia-Pacific Data Center Construction Market Share by Application (2016-2027)
Figure 40. Asia-Pacific Data Center Construction Market Share by Region (2016-2027)
Figure 41. China Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 42. Japan Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 43. South Korea Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 44. Southeast Asia Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 45. India Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 46. Australia Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 47. Latin America Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 48. Latin America Data Center Construction Market Share by Type (2016-2027)
Figure 49. Latin America Data Center Construction Market Share by Application (2016-2027)
Figure 50. Latin America Data Center Construction Market Share by Country (2016-2027)
Figure 51. Mexico Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 52. Brazil Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 53. Middle East & Africa Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 54. Middle East & Africa Data Center Construction Market Share by Type (2016-2027)
Figure 55. Middle East & Africa Data Center Construction Market Share by Application (2016-2027)
Figure 56. Middle East & Africa Data Center Construction Market Share by Country (2016-2027)
Figure 57. Turkey Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 58. Saudi Arabia Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 59. UAE Data Center Construction Market Size YoY Growth (2016-2027) & (US$ Million)
Figure 60. Whiting-Turner Contracting Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 61. Turner Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 62. Holder Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 63. DPR Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 64. Fortis Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 65. HITT Contracting Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 66. STO Building Group (formerly Structure Tone) Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 67. JE Dunn Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 68. Hensel Phelps Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 69. AECOM Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 70. Rogers-O'Brien Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 71. Clune Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 72. Gilbane Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 73. Balfour Beatty US Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 74. Mortenson Construction Revenue Growth Rate in Data Center Construction Business (2016-2021)
Figure 75. Bottom-up and Top-down Approaches for This Report
Figure 76. Data Triangulation
Figure 77. Key Executives Interviewed

SECONDARY RESEARCH
Secondary Research Information is collected from a number of publicly available as well as paid databases. Public sources involve publications by different associations and governments, annual reports and statements of companies, white papers and research publications by recognized industry experts and renowned academia etc. Paid data sources include third party authentic industry databases.

PRIMARY RESEARCH
Once data collection is done through secondary research, primary interviews are conducted with different stakeholders across the value chain like manufacturers, distributors, ingredient/input suppliers, end customers and other key opinion leaders of the industry. Primary research is used both to validate the data points obtained from secondary research and to fill in the data gaps after secondary research.

MARKET ENGINEERING
The market engineering phase involves analyzing the data collected, market breakdown and forecasting. Macroeconomic indicators and bottom-up and top-down approaches are used to arrive at a complete set of data points that give way to valuable qualitative and quantitative insights. Each data point is verified by the process of data triangulation to validate the numbers and arrive at close estimates.

EXPERT VALIDATION
The market engineered data is verified and validated by a number of experts, both in-house and external.

REPORT WRITING/ PRESENTATION
After the data is curated by the mentioned highly sophisticated process, the analysts begin to write the report. Garnering insights from data and forecasts, insights are drawn to visualize the entire ecosystem in a single report.

Please Choose License Type

USD $3500
USD $4500
USD $6000
COVID-19
Offer

WHY US?

  • Why Us In-depth database
    Our Report’s database covers almost all topics of all regions over the Globe..
  • Why Us Recognised publishing sources
    Tie ups with top publishers around the globe.
  • Why Us Customer Support
    Complete pre and post sales support.
  • Why Us Safe & Secure
    Complete secure payment process.